Turkish Transport News ● Published in English since 2007

Intermodal Combined Transport and Logistics Systems Magazine Read issue 42
Rail

The combined transport sector continues its investments in Europe

Terminal and rolling stock commitments have held up through a soft demand cycle, on the expectation that corridor volumes return before the capacity does.

Abstract illustration of rail infrastructure
European combined transport investment has continued through an uneven demand cycle.

Infrastructure decisions are made on a far longer timescale than freight demand moves. Terminals commissioned this decade were specified against traffic forecasts made well before the current corridor pattern emerged, and the capacity being built now is aimed at the decade after this one.

That mismatch explains why investment has continued through a period when volumes themselves have been uneven.

Where the money goes

The spending concentrates in three places: terminal handling capacity, rolling stock that can cross networks without modification, and the control systems that let a train path be sold with confidence.

Of the three, the last is the least visible and the most constraining. Shippers pay a premium for a slot they can count on, and nothing at all for one they cannot.

Capacity that cannot be scheduled reliably is capacity that shippers will not pay a premium for.

The Turkish connection

For Turkish operators the relevance is direct. A European network investing in interchange capability can accept traffic originating further east, provided the equipment and documentation match at the handover.

The commercial opportunity therefore sits with the operators who have already done the compatibility work, not with those waiting for demand to prove itself first.

Key points

  • Investment continued through an uneven demand cycle
  • Spending concentrates on terminals, cross-network rolling stock and control systems
  • Compatibility work decides who captures returning volume